JOB TITLE:
Building HVAC/Synthesis Technician
Belgrade
REPORTS TO:
- MEP Manager
Job Purpose: to be dedicated to Airport Nikola Tesla Project
The summary of tasks and duties assigned to the Building HVAC/Synthesis Technician is as follows:
Responsibilities:
- To coordinate the design studies and the interfaces of MEP disciplines (Mainly HVAC, Synthesis,…)
- To be able to analyze the drawings, the technical input and to propose solutions/optimization for synthesis activity – by drafting synthesis drawings
- To take part of the design review with the Designers and the BIM coordination process
- To report to the MEP Manager and to work in coordination with all the Design Team
Competences:
- 2D design: AutoCAD
- 3D coordination: Navisworks, Clash detection 3D coordination: Navisworks
Must have the following skills:
- To speak fluently English
- Good organizational skills
Deadline for applications: 04.09.2019.
Vinci Terna Construction JV d.o.o.
Vinci Terna Construction JV doo is a construction company established for the Project of reconstruction and extension of the Airport Nikola Tesla Belgrade. The project includes the renovation and extension of Terminal, utilities, airside and landside infrastructure works . Joint Venture has been formed between Vinci Construction Grands Projets and GEK Terna Group.
Više o poslodavcu