Under China Energy Engineering Group Cop., Ltd, Tianjin Electric Power Construction Company (TEPC) has been found since 1964. TEPC has successively undertaken, changed and expanded more than 40 large and medium scale power plants and the total installation capacity has made breakthrough with exceeding 40000 MW. In China, TEPC footprint has been spread to 28 provinces (including cities and autonomous regions), not only having construction in china, TEPC also has undertaken international electric power projects in many countries in the world, such as in India, Sudan, Vietnam, Belarus, Pakistan, Iraq and other countries.
Position Openings at CEEC TEPC
Civil Engineer
Pančevo
Requirements:
- Personal license No. 410;
- Experience in supervising / managing construction works on the at least one project (or phase) of Cogeneration Power Plant with electrical capacity of 10 MW and higher.
Working Time and salary:
- Normally Monday to Saturday 8h per day and 40h per week, OT applies.
- Salary will be determined during interview.
- Costs of transport (for non-Pancevo locals) and work meals are provided by the company.
Deadline for applications: 09.12.2018.
China Energy Engineering Group Tianjin Electric Power Construction Co.Ltd
The company was established on September 29, 2011. China Energy Engineering Group provides energy infrastructure construction services. CEEC mainly construct hydropower stations, power plants and other infrastructure. At the moment, we are working on Shandong Linglong project in Serbia, Vojvodina, the biggest project in Vojvodina. We also offer services Worldwide.
Više o poslodavcu